MTE 482 - Week 13
Mar 30 - April 5
Key Things Completed
- Working on and testing fixes and workarounds for motor controller integration bugs.
 - Final Report.
 
MTE 482 - Week 12
Mar 23 - Mar 29
Key Things Completed
- Continued troubleshooting motor controller communications.
 
MTE 482 - Week 11
Mar 16 - Mar 22
Key Things Completed
- Capstone Symposium.
 - Final battery pack assembly and testing.
 - Enclosure shell assembly completed.
 - Grip tape applied - the board looks sick now.
 - Final firmware integration work, started working on motor controller integration bugs.
 - Replacement buck converter installed only to break again right away.
 
MTE 482 - Week 10
Mar 9 - Mar 15
Key Things Completed
- Capstone demonstration to professors.
 - Overall product software completed.
 - Minor aesthetic updates to remote.
 - Longboard deck is cleaned up, sanded and painted.
 - Suspension assembly complete.
 - First test ride successful under manual propulsion.
 - Battery module assembly and welding completed.
 - Enclosure manufacturing and preliminary assembly completed
 - Motor controller stopped working on one side and then the other.
 - 48V - 19V buck converter stopped working.
 
MTE 482 - Week 9
Mar 2 - Mar 8
Key Things Completed
- Remote control firmware and integration complete.
 - Thermal PCB soldering complete.
 - LED circuitry bench tested.
 - Thermistor interfaces added to battery module design.
 - Continued 3D printing of battery and mounting components.
 - Aesthetic design of enclosure parts.
 - Received machined suspension parts from E3 and springs.
 - Spot welding trials and test parts completed
 
MTE 482 - Week 8
Feb 23 - Mar 1
Key Things Completed
- Main DigiKey order placed.
 - Busbar machining order kicked off.
 - Design lock for battery and hardware mounts.
 - Battery pack wiring configuration and enclosure packaging updated.
 - Beginning of 3D printing for hardware components.
 - Completed additional machining.
 - Completed firmware development in preparation for on-hardware testing.
 
MTE 482 - Week 7
Feb 16 - Feb 22
Key Things Completed
- Reading week - Team took some R&R.
 - Hardware assembly and mounts updated to reflect architecture changes.
 - Preliminary design for enclosure shell and connector components.
 - PCBs ordered.
 - Started machining additional suspension components.
 
MTE 482 - Week 6
Feb 9 - Feb 15
Key Things Completed
- PCB layouts finalized.
 - Battery module mounting and assembly strategy completed.
 - Remote enclosure design is released.
 - Completed design of suspension dynamics.
 - Kicked off suspension manufacturing at E3.
 
MTE 482 - Week 5
Feb 2 - Feb 8
Key Things Completed
- RobotShop order placed.
 - Jetson electrical bench testing.
 - Some LV system redesign of power supply to two different voltages to the Jetson and ESP32.
 - Continued hardware mount design work.
 - Lots of PCB design in the works.
 - Continued work on suspension dynamics.
 - Created drawings for suspension manufacturing.
 
MTE 482 - Week 4
Jan 26 - Feb 1
Key Things Completed
- BMS bench testing complete.
 - Battery module design refinements.
 - Completed battery cell characterization.
 - Completed suspension redesign.
 - Continued work on suspension dynamics.
 - Began suspension component procurement.
 
MTE 482 - Week 3
Jan 19 - Jan 25
Key Things Completed
- HV harnessing design revisions.
 - Major battery pack configuration redesign (6p -> 4p).
 - Continued suspension redesign (spring seats).
 - Began work on dynamics design and spring rate validation.
 
MTE 482 - Week 2
Jan 12 - Jan 18
Key Things Completed
- Motor controller bench testing complete.
 - Began battery cell characterization and testing.
 - Began space allocation for hardware enclosure.
 - Continued suspension redesign (hanger, knuckles).
 - Began off-device testing of software.
 
MTE 482 - Week 1
Jan 5 - Jan 11
Key Things Completed
- HV component testing (BMS, motor controller).
 - Initial design of hardware mount interfaces.
 - Continued suspension redesign (linkages, carriage).
 - Resumed software architecture design and implementation.
 
MTE 481 - Week 12
Dec 1 - Dec 7
Key Things Completed
- Created battery pack electrical layout.
 - Completed V2 suspension subframe CAD and generated latest renders.
 - Prepared and submitted final design report.
 - Website updates.
 - -- End of MTE 481 --
 
MTE 481 - Week 11
Nov 24 - Nov 30
Key Things Completed
- Implemented software task management architecture.
 - Revised hardware design.
 - Ordered key hardware components to arrive in time for preliminary bench testing.
 - Connector material research and initial sourcing for the battery system.
 - Ordered wheels.
 
MTE 481 - Week 10
Nov 17 - Nov 23
Key Things Completed
- Completed initial detail design for each subsystem.
 - Completed hardware design.
 - Prepared Final Design Presentation.
 - Website updates.
 
MTE 481 - Week 9
Nov 10 - Nov 16
Key Things Completed
- Finalized motor selection and battery back layout.
 - Completed suspension linkage design and V2 CAD.
 - Finished hardware selection.
 - Started software implementation.
 
MTE 481 - Week 8
Nov 3 - Nov 9
Key Things Completed
- Completed HV (motor and battery) analysis.
 - Software architecture design.
 - Continued hardware system design.
 - Website updates.
 - Continued V2 suspension CAD.
 
MTE 481 - Week 7
Oct 27 - Nov 2
Key Things Completed
- Continued hardware system design.
 - Initial battery system design, including sourcing of 18650 Li-Ion cells.
 - Began V2 suspension CAD with re-tuned suspension package layout.
 
MTE 481 - Week 6
Oct 20 - Oct 26
Key Things Completed
- Preliminary Design Presentation.
 - Began hardware parts selection and architecture design.
 - Began development of PSD road profiler for suspension tuning.
 - Continued V1 suspension CAD.
 
MTE 481 - Week 5
Oct 13 - Oct 19
Key Things Completed
- Wrote Preliminary Design Presentation.
 - Further research into solutions for product subsystems.
 - Investigation of potential battery cell solutions.
 - Investigation of suspension setups using visualization tool.
 - Began V1 suspension CAD.
 - Website updates.
 
MTE 481 - Week 4
Oct 6 - Oct 12
Key Things Completed
- Preparatory work for Preliminary Design Presentation.
 - Continued research and preliminary design work on product subsystems.
 - Research on high level battery pack principles and design practices.
 - Began development of suspension geometry visualization tool.
 
MTE 481 - Week 3
Sep 29 - Oct 5
Key Things Completed
- Explored existing solutions to determine key gaps and potential innovations.
 - Compared and selected which solutions and systems to begin development on.
 - Preliminary research into the technical requirements behind each system.
 
MTE 481 - Week 2
Sep 22 - 28
Key Things Completed
- Conducted needs analysis and identified areas for improvements on existing solutions.
 - Researched potential solutions and existing patents.
 - Website updates.
 
MTE 481 - Week 1
Sep 15 - 21
Key Things Completed
- Selected and finalized the problem to address.
 - Identified needs, criteria, and constraints for the problem.
 - Made website.